01/12/15

 

Fishel has been awarded the contract to replace the existing wastewater main in Broadway Road between Horne and Williams.

Traffic on Broadway Road is undergoing several changes as abandonments occur.  Crews will be applying a slurry seal on Broadway Road from Lazona to Williams this week.   
 

Traffic Restrictions:

Traffic is currently one lane in each direction on Broadway Road from Horne to Williams.

Project Schedule

Construction is anticipated to begin end of May 2014 and will be completed by January 2015.

Project Details

The existing wastewater main in Broadway Road between Horne and Williams was originally constructed in the 1950's and 1960's.  The sewer main needs to be replaced based on a combination of pipe age and lack of adequate pipe slope.

Project Funding

This project is funded by the voter approved 2006 Wastewater Bonds.

 

 

Project Location Map

Fact Sheet

Construction Progress Photos

Road Closures and Lane Restrictions

Engineering Home

Find us: mctraffic  Facebook Icon  Twitter Icon

Open during Construction

 

The businesses listed below are participating in our Shop Mesa program and are offering some great construction specials! Be sure to check them out!