Signal Butte Road and Elliot Road

The Signal Butte and Elliot Road area is teeming with new construction.  Due to the growth in the area, it is essential for the City of Mesa to install new or improve the existing infrastructure in the area to help support the current needs of the neighborhoods as well as the new growth.

Below is a short synopsis of the current projects as well as upcoming improvements coming to this area.

Signal Butte and Elliot Road Intersection Improvements - COMPLETED

Upcoming Projects - 2011

The Signal Butte and Elliot Road street improvements project is completed!  During construction, the scope of the project was expanded to include additional utility connections and roadway improvements; as a result, the contract time frame was lengthened.  The newly improved intersection includes three northbound lanes and one southbound lane, new street lights, curb, gutter, and sidewalks.  Drainage improvements including new retention basins were added to improve the drainage in the area.  Utility improvements include new sewer lines and water lines.

There are two upcoming projects scheduled to begin this year in your area.  The first project is the Utility and Roadway Improvements Project.  This project includes installation of water and wastewater lines on Elliot Road from Ellsworth to Signal Butte Road.  Construction is scheduled to begin in September 2011, and is estimated to be completed within five months. View more

The second project is the Well Collection Pipeline and Fiber Optic Improvements on Elliot Road from Crismon to Signal Butte Road. This project will be constructed in concurrence with the project listed above. View more

Upcoming Projects - 2012

Contact Information

The third upcoming project in your area is the Utilities and Roadway Improvements Project on
Elliot and Signal Butte Road. This project includes installation of waterlines, street lighting, sidewalks, asphalt and landscaping
south of the intersection along the west side of Signal Butte Road. Construction is scheduled to begin in January 2012 and is estimated to be completed within seven months. View more
Achen Gardner has been awarded the two projects - Utility and Roadway Improvements Project on Elliot Road from Ellsworth to Signal Butte Road and the Well Collection Pipeline and Fiber Optic Improvements on Elliot Road from Crismon to Signal Butte Road.

Achen Gardner's Project Superintendent for these projects is Jeff Jensen (602) 980.1784.

http://www.achen.com/

 

 

 

 

Engineering

City of Mesa
PO Box 1466
Mesa, AZ  85211

Administration and Design
480-644-2251 - Tel
480-644-3392 - Fax

Real Estate Services
480-644-2577 - Tel
480-644-3392 - Fax

Monday -Thursday
7:00 A.M. to 6:00 P.M.

Except Holidays

Construction
480-644-2253 - Tel
480-644-3971 - Fax

Public Relations
(Roads)
480-644-3800 - Tel
480-644-3971 - Fax
engineering.info@mesaaz.gov

Materials Lab
480-644-6937 - Tel
480-644-4680 - Fax
mat.lab@mesaaz.gov

Monday - Friday
6:00 A.M. to 5:00 P.M.

Except Holidays