Elliot Road Roadway Improvements - CP0982
- Project typeRoadway Improvement
- Project schedule2025 - 2026
Federal Aid No. MES-0(293) D
TRACS No. 0000 MA MES T0359 3D
The scope of work for this project includes:
- Widening of the existing two-lane road along Elliot Road to three eastbound and three westbound through-traffic lanes and an eastbound/westbound striped bike lane
- Raised medians and new sidewalk along Elliot Road between Sossaman Road and L-202
- Drainage improvements along Elliot Road that will discharge into the EMF.
- Street light improvements, modifying or replacing existing traffic signals at the intersections of Elliot Road/Sossaman Road and Hawes Road/Ellsworth Road, and installing a new traffic signal at the intersection of Elliot Road and 80th Street
- Landscaping within the corridor
A project-level transportation conformity hot-spot analysis was also developed for this project. The draft report is available for public review and comment through October 30, 2024 on Arizona's Department of Transportation website.
Construction is anticipated to begin in late 2025 and last approximately 20 months. In general, traffic on all roads will be maintained during construction. Public meetings for this project are to be determined.