The Signal Butte Park Phase II project will be located just north of the existing Signal Butte Park (north of the desert wash). Improvements will include the addition of a parking lot (45 spaces and 2 handicap stalls), ramadas (1 large and 2 small), restroom, pathway lighting (paved sections only), stabilized native soil and asphalt concrete pathways (1.59 total miles), pump tracks, and a pedestrian bridge over the wash to connect Signal Butte Park Phase I to Phase II.
Updated Park Plan, July 2025 - Signal Butte Park Phase II - FINAL Park Plan(PDF, 46MB)
Public meeting's held on November 29, 2022 and Fall 2023
3355 S. Signal Butte Rd, Mesa, AZ 85212 View Map
3355 S. Signal Butte Rd , Mesa, AZ 85212
Engineering Public Relations
480-644-3800
engineering.info@mesaaz.gov