Eastern Canal Shared Use Path - CP0673 / CP0730CAP / CP1060

  • Project typeBike & Pedestrian Recreation
  • Project scheduleFall 2024 - Fall 2025
decorative
  • Enhanced crossings – Traffic signals at Broadway Road, Main Street, Val Vista Drive, University Drive, and Brown Road and a Rectangular Rapid Flash Beacon at Adobe Street. Design began in spring 2021, and with construction anticipated to begin by Fall 2024, and completed by Spring 2025.

  • Eastern Canal Shared Use Path (Central) – Brown Road to Broadway Road (2.3 miles): The east bank of the canal will be paved, and pathway lighting added. Design began in spring 2022 with an estimated completion date of fall 2024. Construction is expected to begin in the Fall of 2024 and be complete by the Fall of 2025.

  • Eastern Canal Shared Use Path (South) – Broadway Road to Baseline Road (2.2 miles): The east bank of the canal will be paved, and pathway lighting added. Design began in winter 2023 with an estimated completion date of fall 2025. Construction is expected to begin in the Fall of 2024 and be complete by the Fall of 2025.