Lehi Crossing Shared Use Path - CP0672
- Project typeBike & Pedestrian Recreation
- Project scheduleTrailheads Completed Winter 2025
South Canal from McDowell Road to the 202 Freeway and along the ADOT right-of-way to Val Vista Drive (2.5 miles): There will be two trailheads constructed. One at McDowell Road and the South Canal and the other at Val Vista Drive north of the 202 Freeway.
The path will be paved 12 feet wide with a separate surface for equestrian users, lighting will be installed and the crossing at Val Vista Road will be a grade separated tunnel.
Design began in the summer of 2020.