Construction Manager at Risk & Job Order Contracting Opportunities

Please read the entire Request for Qualifications (RFQ) and all attachments before submitting a Response. Responses must be in accordance with the provisions, specifications and instructions set forth in the RFQ. Responses will be accepted until the date and time the Response is due. All Responses received after the Response due date and time shall not be considered for award.

To differentiate the projects on our website, the projects listed on this page are strictly for Construction Managers at Risk services and Job Order Contracting opportunities. Contractors can register in the Mesa Vendor Self-Service (VSS) System.

Response Submission

We only accept electronic submissions for selections.

Email your Response to Engineering-RFQ@mesaaz.gov

  • Maximum file size is 20 MB. Please ensure that your email is smaller than this before sending.
  • Email SUBJECT line must include the Project Number/Name and Due Date/Time.

Responses received after the due date and time shall not be considered for award. Upon submission of an SOQ, a confirmation email will be sent. If no email is received, please reach out to the contact listed in the RFQ to verify receipt.

Questions or Concerns

Engineering will investigate all questions submitted regarding opportunities listed below. If the answer is not already in the bidding documents/RFQs an addendum will be issued. If the question is NOT answered via an addendum the answer can be found in the bidding documents/RFQs.

The Protest Policy is in Procurement Rules(PDF, 406KB) , Article 6. Protest, Appeals, Debarments, Confidential Information, and Contract Disputes.

Opportunities

Project Submission DUE Date/Time
Related Documents

Eastmark and Red Mountain Aquatic Complex CP0756SEAQ/CP0757RMAQ(PDF, 412KB)

Entering negotiations with: 

  • Sun Eagle Corporation

April 16, 2026, by 2:00 pm

Pre-Submittal Planholder's List(PDF, 85KB)

Eastmark Exhibit(PDF, 6MB)

Red Mountain Exhibit(PDF, 11MB)

MAC Lighting and Controls System Upgrades CP1191MACL(PDF, 284KB)

Entering negotiations with:

  • Concord General Contracting
March 26, 2026, by 2 p.m.

 

Pre-Submittal Meeting Attendance Sheet(PDF, 77KB)

Idea Museum Renovations Phase 2 Project No. CP1219(PDF, 289KB)

Shortlisted Firms:

  • Caliente Construction
  • Concord
  • Mortenson

Entering negotiations with:

  • Mortenson
December 18, 2025, by 2 p.m.

Pre-Submittal Presentation(PDF, 1MB)

Pre-Submittal Meeting Attendance Sheet(PDF, 79KB)

Brown Road Water Treatment Plant Electrical Upgrade Project No. CP1254BR01(PDF, 329KB) December 18, 2025, by 2 pm Pre-Submittal Meeting Attendance Sheet(PDF, 53KB)

Mesa Public Safety Communications Facility Project No. CP1239(PDF, 316KB)

Entering negotiations with:

  • Willmeng Construction
November 6, 2025, by 2 p.m.

Conceptual Site Plan(PDF, 5MB)

Pre-Submittal Planholder's List(PDF, 77KB)

Hohokam Stadium Improvements Project No. CP1292HOME(PDF, 306KB)

Entering negotiations with:

  • Mortenson
October 16, 2025, by 2 p.m.

 

Hohokam Stadium Scoping Document(PDF, 7MB)

Pre-Submittal Meeting Attendance Sheet(PDF, 82KB)

 

For opportunities prior to those listed above, please email EngineeringBids@mesaaz.gov. Please include the project number and full name of the project that you are requesting.