We have updated City Hall meeting policies--effective June 1-- to support a safe, welcoming and accessible environment while maintaining full public access and participation.
Below are details about environmental requirements for all projects and construction within Mesa incorporated areas.
Environmental Requirements for Construction Activities in Mesa manual(PDF, 350KB) - Technical guidance to developers, property owners, engineers, contractors and others involved with construction activities as a means to comply with the Particulate Sources and Storm Water Pollution Control ordinances.
Flood Control District of Maricopa County (FCDMC) Drainage Design Manual Erosion Control manual (November 2018) - Details pertaining to best management practices and applies to all Mesa projects under contract to the Engineering Department or other city department and/or installed on any city property; including, public right-of-way areas (e.g. city owned and operated streets, catch basins, scuppers, etc.). Amendments to the FCDMC manual have been incorporated in the Mesa City Code.
Mesa construction projects are those projects conducted by us and under contract to the Engineering Department or another department. The following elements are required for Mesa construction projects and contractors shall be aware of these requirements prior to submitting bids.
Low Impact Development - Land planning and engineering design techniques that work with nature to manage stormwater.
480-644-3599
environ.info@mesaaz.gov
PO Box 1466 Mesa, AZ 85211
Monday - Thursday 7:00 am to 6:00 pm
Use the online report or call 480-644-3599 to report: